Skip to main content
Language set to English. 0 of 3 packages selected for comparison.
FREE SOLAR CLEANING KIT ON ELIGIBLE 3 KW+ SOLAR INSTALLATIONSBOOK BY 31 DECEMBER 2026 – LIMITED STOCK!
VIEW OFFER
Government Subsidy5 min read

PM Surya Ghar & UP State Solar Subsidy Guide for Varanasi Homeowners

Clear explanation of Central PM Surya Ghar + UP State residential subsidy slabs, UPNEDA empanelment, DCR requirements, and actual payment sequence.

Residential rooftop solar system on Heavy GI/MS structure eligible for PM Surya Ghar subsidy

Central + UP State Subsidy Structure for Eligible Residential Connections

For eligible domestic electricity connections installed through an authorized vendor using DCR (Domestic Content Requirement) solar modules, combined Central and Uttar Pradesh State subsidies currently amount to ₹90,000 for 2 kW (₹60,000 Central + ₹30,000 UP State) and ₹1,08,000 for 3 kW and above (₹78,000 Central + ₹30,000 UP State cap).

Commercial, industrial, and institutional connections are not eligible for residential PM Surya Ghar subsidies.

Payment Order & Indicative 1–6 Month Credit Timeline

Customers initially pay the complete system price to the vendor (or through an approved solar loan). After rooftop installation, DISCOM net-meter inspection, commissioning, and online portal verification, the government credits the approved subsidy directly into the customer’s bank savings or loan account within an indicative timeframe of approximately 1 to 6 months, subject to official portal processing.

Kashi Traders has been an authorized vendor on the PM Surya Ghar portal since December 2024, with UPNEDA residential rooftop solar vendor empanelment approval documented on 6 March 2025.